Responsible for
initial screening of incoming work orders, identification of scope, and
analysis of required level of planning
Conducts field walk
downs to identify and document job requirements
Identifies specific
safety hazards that will be encountered in the performance of the proposed
work
Develop detailed
work- pack for execution of the task, which is including but not limited
to: wringing procedures, tasks and job, plans, estimates required hours on
work order tasks, total work order duration, and skills required to
perform the task, identifying or ordering required spares, identifying
required technical support to implement tasks, including contractors,
raising call-off with the contractor companies, procures equipment and
specialized tools required to perform work
Plans jobs with
appropriate level of detail for the given skilled trades workforce
Determines and
includes QA/QC requirements on jobs
Gathers necessary
engineering or technical documents, specifications, and drawings
Writes clear and
concise work procedures
Determines and
arranges for parts required to perform the work (when no expediter
exists)
Plans parts for all
projects to increase “wrench time” and maximize efficiency
Compiles
information into a job package that is ready for skilled trades – clearly
communicates with skilled trades regarding critical steps in the
process
Prints and delivers
work orders to the skilled trades in conjunction with the weekly work
schedule
Upon completion of
jobs, communicates with skilled trades regarding ideas and procedures that
would make future jobs more efficient
Coordinates
priority setting with the management team – places specific emphasis on
obtaining the input of operations personnel in the setting of
priorities
Keeps bills of
materials current
Can accurately
measure the maintenance backlog in its various forms and continually
maintains not less than 2 weeks’ worth of ready backlog always
Responsible for
equipment and repair parts data entry and management
Ensures all work
orders and maintenance log items are closed when work is finished
Participates in
outage planning activities such as scope identification and control,
scheduling, coordination, risk assessment, execution, and continuous
improvement
Communicates with
contractor resources directly on specific work orders assigned to the
contractors and the performance expectations of the work order. Does not
manage the contractors, but ensures that all the details of the work order
are clearly communicated and understood
Participates with
Reliability Department personnel on improvement projects, particularly when
they are related to the proactive maintenance plan
Responsible for
initial screening of incoming work orders, identification of scope, and
analysis of required level of planning
Conducts field walk
downs to identify and document job requirements
Identifies specific
safety hazards that will be encountered in the performance of the proposed
work
Develop detailed
work- pack for execution of the task, which is including but not limited
to: wringing procedures, tasks and job, plans, estimates required hours on
work order tasks, total work order duration, and skills required to
perform the task, identifying or ordering required spares, identifying
required technical support to implement tasks, including contractors,
raising call-off with the contractor companies, procures equipment and
specialized tools required to perform work
Plans jobs with
appropriate level of detail for the given skilled trades workforce
Determines and
includes QA/QC requirements on jobs
Gathers necessary
engineering or technical documents, specifications, and drawings
Writes clear and
concise work procedures
Determines and
arranges for parts required to perform the work (when no expediter
exists)
Plans parts for all
projects to increase “wrench time” and maximize efficiency
Compiles
information into a job package that is ready for skilled trades – clearly
communicates with skilled trades regarding critical steps in the
process
Prints and delivers
work orders to the skilled trades in conjunction with the weekly work
schedule
Upon completion of
jobs, communicates with skilled trades regarding ideas and procedures that
would make future jobs more efficient
Coordinates
priority setting with the management team – places specific emphasis on
obtaining the input of operations personnel in the setting of
priorities
Keeps bills of
materials current
Can accurately
measure the maintenance backlog in its various forms and continually
maintains not less than 2 weeks’ worth of ready backlog always
Responsible for
equipment and repair parts data entry and management
Ensures all work
orders and maintenance log items are closed when work is finished
Participates in
outage planning activities such as scope identification and control,
scheduling, coordination, risk assessment, execution, and continuous
improvement
Communicates with
contractor resources directly on specific work orders assigned to the
contractors and the performance expectations of the work order. Does not
manage the contractors, but ensures that all the details of the work order
are clearly communicated and understood
Participates with
Reliability Department personnel on improvement projects, particularly when
they are related to the proactive maintenance plan
Namizədə tələblər
Functional:
To review
notifications raised (for qualitative filling out)
Create all types of
maintenance orders
Plan labor and
materials required to execute the orders
Maintenance orders
management & to make sure that all types of orders are closed in time
Communicate work
planning package information to maintenance supervisors
Review work orders
feedback information to improve future planning efforts